Client
Schweppes
Challenge
- Evacuation of the purified water coming from temporary treatment station.
- Preventing the regular overflow of the water treatment plant.
Solution ZUKO
- Installation of a pumping station with 2 pumps.
- Replacement of PVC piping by HDPE piping (thermowelded).